Sunday, May 11, 2008

Ulthwaite - more work



The Lake District layout is now known as 'Ulthwaite'. (There may be a real Ulthwaite.. but it's not this one!) Been fettling the track and testing all my stock to make sure there aren't too many needless derailments. It's actually working a lot better than I thought. but I do keep wondering if I'd be better ripping it up and laying some 'proper' track. Started to mock up some buildings etc to get a feel for how things are going to look. I like the fiddle exit between two cottages , rather than under a bridge (which was my first thought). Also been thinking about operating sequences to plan any further purchases.

Thursday, May 8, 2008

Lake District 009 project starts to take shape..

For once, I've actually put a bit of planning into a layout. The setting is somewhere in the northern part of the English Lake District..Borrowdale perhaps. A fictitious narrow gauge light railway built to haul ore/slate from the hills to an interchange at Keswick also makes revenue through general traffic. This little village terminus sees coal, goods and sheep being transported, as well as a few passengers and some tourists/walkers. It also is a place for small engines pulling ore skips from up the valley to run around before continuing off down towards the interchange.. The board is recycled from a previous layout. I laid a layer of camping groundmat down, which proved to be a bit of a nuisance once I started to install the GEM wire-in-tube point control, and may well infuriate me further when scenic work starts. The track is a first for me - all hand-built copper clad soldered construction. I've just started testing and fettling to make sure everything is running properly before I start ballasting or painting (a process which will hide the rough appearance of the track at the moment). I kind of wish I had tried this track building lark out in a larger scale to start with.. but why not jump in at the deep end eh?

Monday, May 5, 2008

Something for the weekend?

A diversion the other weekend.. thinking I'd like a quick project, I spotted a spare little pine shelf about 570mm long. A bit of foam core.. a chopped up cereal packet.. some quickly laid track, a scattering of a few scenic bits and within the next couple of days this little N scale 3-2-2 inglenook layout was born. Good fun!







Friday, March 7, 2008

Endal Street - a dual gauge shoebox layout



One of my favourite designs on Carl's micro site is 'Endal Street'.. an ambitious shoebox plan from Jon Songoygard in Norway.
It features dual gauge track running through cobbled streets and overhead electrics. In a moment of madness I thought I'd give it a go! (Like I haven't got enough started)..
I figured it might be quite nice to try and build it using foamcore and card/paper. The turntable and sector plate might present some difficulties.. but I'll worry about that later.
So far, box built, track built (soldered construction). Next step.. worry about the turntable and sector plate!
I really don't know if I'll pull this off.. but it's worth a try.

Sunday, February 24, 2008

Some 009 stock



Been a while since last update (a Hard drive crash didn't help!).
One of the projects I've been planning is a 009 layout. At the moment a fictitious railway set in the Lake District is a likely candidate. I know I need some quality stock to get the best out of this scale so I bought a Dapol N gauge 45xx loco and A chivers WHR Russell kit and prayed they would fit!
As it happens, they do! I haven't extended the pony trucks, although I might.. but I don't mind that it's not a direct copy of Russell, just that it looks good and runs well. Seen here posing on 'Maunfoot' - a 009 micro layout.
New problem - the stock I had built so far all looks really tiddy next to this new loco (temporarily named Edith until I get some nameplates). I might end up anglicising the Liliput HOe stuff, or simply stick to a larger prototype. I quite like the Ashover anyway, so maybe that's the way to go..

Tuesday, January 1, 2008

A bit more 3mm

The last couple of weeks have seen some progress on my 3mm 'project'. I've laid a length of test track on a spare pine shelf. It's just 585mmx140mm, but enough for an A4 point and a little bit of track either side. The idea was to have a go at 'properly' handlaying solder constructed track before starting on a layout.

The sleeper built buffers tops are scratchbuilt in plasticard. I figured it was easier than trying to make up rail built ones!

It's 14.2mm gauge (3mm finescale), the rails are 3mm society code 60 bullhead, a lot easier to work with than I thought it would be. The switch isn't elegant but it serves it's purpose. I plan to hide it anyway.

The Y6 tram has had a paint job and some extra roof detail. A little bit of detail paint work to tidy it up and that's done. I'm really pleased with it.

Saturday, December 15, 2007

Some progress in 3mm scale

Plankerton Wharf continues to be attended to ..been adding card 'concrete' surface. But last week I was off work with a chest infection which actually gave me a bit of modelling time.
As well as planning my 009 project (and doing some small work on Maunfoot - more of which later).. I decided to do something about some 3mm bits awaiting attention.

I had discovered an old RM article by the Rev Awdry online about his sctrachbuilt 'Toby' based on a Y6 tram loco and decided to give it a go...

I already had a 14.2mm gauge Halling motor bogie from 3SMR and designed a plastic card body 'kit' to fit around it. It's not deadly accurate but I feel gives a nice representation of a Y6. I like it anyway!
I figured I might try fitting Greenwich couplings to my 3mm stock (all of two wagons and this loco). At first I was a bit concerned that they might be too Narrow Gauge in style.. but I'm really pleased with the results. Must buy more!
For more information about 3mm scale modelling (the 'modellers' scale'), see the society website.. http://www.3mmsociety.org.uk/index.htm